OAHU LANE CLOSURES  FOR THE WEEKEND OF APRIL 26 – APRIL 28

PLEASE NOTE:  Lane closure schedules may change at any time without further notice.  
All projects are weather permitting.

--- H-1 FREEWAY ---

1) HONOLULU (WEEKEND WORK)

Alternating lane closure on the Airport offramp (Exit 16) from the westbound H-1 Freeway on Saturday, April 27, from 5:30 a.m. to 11 a.m., for bridge maintenance.

2) KAPOLEI(WEEKEND/NIGHT WORK)

Closure of the H-1 Freeway in the westbound direction between the Makakilo Drive overpass and the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1) on Sunday night, April 28, through Monday morning, April 29, from 10 p.m. to 5 a.m., for the Kapolei Interchange Complex Phase 2 project.

3) PEARL CITY (WEEKEND WORK)

Right lane closure on the H-1 Freeway in both directions in the vicinity of the Kaahumanu Street overpass on Saturday, April 27, from 8 a.m. to 1 p.m., for maintenance work.

4) WAIMALU TO AIEA (WEEKEND/NIGHT WORK)

Shoulder closure on the H-1 Freeway in the eastbound direction between the Pearlridge/Waimalu offramp (Exit 10) and the Aiea Heights Drive overpass on Saturday, April 27, and Sunday, April 28, from 12 a.m. to 11:59 p.m., for shoulder widening work.

5) PEARL CITY TO AIEA (WEEKEND/NIGHT WORK)

Up to three lanes closed on the H-1 Freeway in the eastbound direction between the Waiawa Interchange and the Aiea Heights Drive overpass on Saturday night, April 27, and Sunday night, April 28, for shoulder widening work. The shoulder will be closed.

  • On Saturday night two right lanes will be closed from 7 p.m. to 9 a.m. Three lanes will be closed from 8 p.m. to 7:30 a.m.
  • On Sunday night two right lanes will be closed from 6:30 p.m. to 4 a.m. Three right lanes will be closed from 7:30 p.m. to 4 a.m.

 

6) WAIMALU TO AIEA (NIGHT/WEEKEND WORK)

Up to three lanes closed on the H-1 Freeway in the eastbound direction between the Waiawa Interchange and the Aiea Heights Drive overpass from Friday, April 26, through Saturday morning, April 27, for shoulder widening work.

  • One right will be closed from 10 a.m. to 6:30 p.m.
  • Two right lanes will be closed from 6:30 p.m. to 7:30 p.m.
  • Three right lanes will be closed from 7:30 p.m. to 6 a.m.

 

--- H-201 MOANALUA FREEWAY ---

1) MOANALUA (WEEKEND/NIGHT WORK)

Lane closures on the H-201 Moanalua Freeway in the eastbound direction between the Ahua Street overpass and the Funston Road overpass, on Sunday, April 28, through Friday, May 3, from 9 p.m. to 4 a.m., for median work.

2) MOANALUA (WEEKEND WORK)

Lane closure on the H-201 Moanalua Freeway in the eastbound direction between the Ahua Street overpass and the Middle Street overpass, on Sunday, April 28, through Friday, May 3, from 9 a.m. to 3:30 p.m., for trenching and utility work.

--- FARRINGTON HIGHWAY (ROUTES 93/930) ---

1) MAKAHA ()

Closure of Farrington Highway(Route 93) in both directions between Upena Street and Kili Drive at the Makaha Bridge #3 on Saturday night, April 27, through Sunday morning, April 28, from 9 p.m. to 6 a.m., for bridge repairs. Motorists will be detoured in both directions via Makaha Valley Road, Ala Holo Loop, Huipu Drive, and Kili Drive.

--- NIMITZ HIGHWAY (ROUTE 92) ---

1) HONOLULU (WEEKEND WORK)

Left lane closure on Nimitz Highway (Route 92) in the eastbound direction between Kakoi Street and Puuloa Road on Saturday, April 27, from 6 a.m. to 11 a.m., for maintenance work.

--- PALI HIGHWAY (ROUTE 61) ---

1) NUUANU TO KANEOHE (WEEKEND AND WEEKLY CLOSURE)
Closure of the Pali Highway (Route 61) in both directions between Waokanaka Street and Kamehameha Highway on Saturday, April 27, through Friday, May 3, over a 24-hour period, for slope stabilization work following the landslide. The Kailua-bound lanes will be temporarily open during the schedule below.

2) NUUANU (WEEKEND AND WEEKLY WORK)

Roving right lane closure on the Pali Highway (Route 61) in both directions in the vicinity of Waokanaka Street on Saturday, April 27, and on Monday, April 29, through Friday, May 3, from 7 a.m. to 2:30 p.m., for maintenance work.

--- KALAELOA BOULEVARD ---

1) KAPOLEI (WEEKEND/NIGHT WORK)

Lane closure on Kalaeloa Boulevard in the northbound direction between Kapolei Parkway and Farrington Highway on Sunday night, April 28, through Friday morning, May 3,from 8 p.m. to 4:30 a.m., for the Kapolei Interchange Complex Phase 2 project.Motorists wanting to access the westbound H-1 Freeway will be detoured via Kapolei Parkway, Kamokila Boulevard, and Wakea Street to the Farrington Highway onramp.

--- SALT LAKE BOULEVARD ---

1) HONOLULU ()

Roving right lane and shoulder closure on Salt Lake Boulevard in both directions between Kamehameha Highway and Puuloa Road on Saturday, April 27, from 8 a.m. to 2 p.m., for maintenance work.

--- KALIHI STREET (ROUTE 63) ---

1) KALIHI ()

Lane closures on Kalihi Street in both directions between Beckley Street and Nimitz Highway for tree removal and striping work. Two lanes will remain open at all times.

  • Lanes will be closed in the northbound direction from Dillingham Boulevard to King Street on Sunday, April 28, from 7 a.m. to 4:30 p.m.
  • Lanes will be closed in both directions from Nimitz Highway to Beckley street on Monday night, April 29, through Friday morning, May 2, from 7 p.m. to 4:30 a.m.

--- MIDDLE STREET ---

1) KALIHI (24-HOUR CLOSURE)

The west shared use walkway and bike path are closed on Middle Street between North King Street and Kamehameha Highway on Friday night, April 26, through Friday night, May 3, over a 24-hour period, for the Middle Street pavement reconstruction project. Pedestrians are directed to use the east sidewalk.